D-Link Forums

The Graveyard - Products No Longer Supported => Other D-Link Products => DSP-W215 => Topic started by: palpate on April 10, 2016, 07:09:33 PM

Title: Schedule Not working as expected
Post by: palpate on April 10, 2016, 07:09:33 PM
I got 4 of these plugs and spent hours of phone calls with Dlink tech support and 10+ times of factory reset and finally got them connected and saw them on mydlink portal. Then I started the programming and discovered the problem. I talked with a level 2 support and explained how to duplicate the error. A week has passed and no response.

I have 2 plugs to run on a schedule to switch on/off alternatively. The program as follow:

Basic 1: 19:15 to 23:45 for 15 mins cycle
Basic 2: 19:00 to 23:45 for 15 mins  cycle

Plug A runs on Basic 1 so, it is on at 15 and 45, off at 30 and 00
Plug B runs on Basic 2 so, it is on at 00 and 30, off at 15 and 45

They work fine as programmed until 20:00.

From 20:00 onward, both plugs run on Basic 2.

I have tried factory reset, changed firmware, all failed.
Title: Re: Schedule Not working as expected
Post by: FurryNutz on April 11, 2016, 07:42:25 AM
Do you have a case #?