it seems that I can only create a single test schedule. the 'schedule list' never holds more than one entry.
this page seems messed up!
I'd like to be able to test the two disks at different times and have both short and long term tests scheduled independently, requiring 4 entries:
left short term
left long term
right short term
right long term
or is this ability there but the page is so clunky someone with a brain can't get it to work?